Civic Archives - Arch13 Studios https://www.arch13.com/category/civic/ The personal website of Bryce W. Bounds Thu, 04 Jun 2020 03:38:41 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.5 https://www.arch13.com/wp-content/uploads/2020/04/cropped-A13favicon-1-32x32.png Civic Archives - Arch13 Studios https://www.arch13.com/category/civic/ 32 32 23344472 Billy L. Cypress THPO Administration Building https://www.arch13.com/billy-l-cypress-thpo-building/ Wed, 20 May 2020 21:44:56 +0000 http://www.arch13.com/?page_id=1880 The Billy L. Cypress THPO Museum Administration Building is a new office, administration and artifact storage building located in the Big Cypress Seminole Tribe of Florida reservation. Wolfgberg Alvarez & Partners was commissioned by the Tribe to design and oversee the construction of a new facility to house their administrative staff and antiquities servicing the […]

The post Billy L. Cypress THPO Administration Building appeared first on Arch13 Studios.

]]>
.easingslider-1879 { max-width: 960px; }.easingslider-1879 .easingslider-image { max-height: 600px; max-width: 960px; }.easingslider-1879 .easingslider-fade-in, .easingslider-fade-out { -webkit-animation-duration: 400ms; -moz-animation-duration: 400ms; animation-duration: 400ms; }

The Billy L. Cypress THPO Museum Administration Building is a new office, administration and artifact storage building located in the Big Cypress Seminole Tribe of Florida reservation.

Wolfgberg Alvarez & Partners was commissioned by the Tribe to design and oversee the construction of a new facility to house their administrative staff and antiquities servicing the Ah-Tah-Thi-Ki Museum, an American Alliance of Museums accredited facility. For years the existing adjacent building storage of artifacts had been at capacity, with museum staff working from project trailers to dedicate more museum square footage to exhibits. The new program required amassing the spread out museum support staff and equipment under one “roof” comprised of an existing adjacent structure and the new administration building.

WA worked tirelessly with the tribe to design a facility that met their needs and took future expansion on the site into account, mindful of the adjacent existing building vernaculars. The construction project broke ground in 2018 after passing both Tribal Building Department review. The project also required environmental review as it is located on historically sensitive wetlands of the everglades shared with the adjacent national park.

Mr. Bounds joined the team as the Project Architect during the construction phase, when the prior Project Architect moved on to a new opportunity just as core & shell phase of construction was being completed. He worked with the Tribe’s project management company to achieve completion within the expected time frame. He assisted in identifying additional services for the building occupant staff that better fit the scope to their evolving needs as opening approached.

The building was opened to the public in the fall of 2019

Location:

30290 Josie Billie Hwy PMB 1003, Clewiston, FL 33440

Budget:

$ 2Million+

Market Sector:

Civic

The post Billy L. Cypress THPO Administration Building appeared first on Arch13 Studios.

]]>
1880
Miami Beach Jewish Community Center https://www.arch13.com/miami-beach-jewish-community-center/ Tue, 23 Jun 2015 19:50:25 +0000 http://www.arch13.com/?page_id=207 The Miami Beach Jewish Community Center was originally housed in a small formerly residential structure leased by the city of Miami Beach along prime real estate on Indian Creek. The existing facilities where inadequate for the expanding membership and population boom of Miami Beach in the 2000’s, and STA Architectural Group was approached for design […]

The post Miami Beach Jewish Community Center appeared first on Arch13 Studios.

]]>
.easingslider-215 { max-width: 900px; }.easingslider-215 .easingslider-image { max-height: 600px; max-width: 900px; }.easingslider-215 .easingslider-fade-in, .easingslider-fade-out { -webkit-animation-duration: 400ms; -moz-animation-duration: 400ms; animation-duration: 400ms; }

The Miami Beach Jewish Community Center was originally housed in a small formerly residential structure leased by the city of Miami Beach along prime real estate on Indian Creek. The existing facilities where inadequate for the expanding membership and population boom of Miami Beach in the 2000’s, and STA Architectural Group was approached for design concepts shortly after 2000.

The new design had a childcare facilities, a full gym, regulation size basketball and racquetball courts, and a banquet space with warming kitchen. The design allowed for a future 3rd floor and special provisions had to be made in the CA to allow for this with minimal disturbance to the building in the future. The grounds also consisted of a regulation size soccer field and swimming pool.

When Bryce joined the firm on late 2011, the project had already been permitted and gone through two rounds of VE to match available fundraising. Bryce joined the project as the assistant project manager shortly before ground breaking, and handled all day to day CA responsibilities as well as attending all site visits and board meetings with the PM and firm principal. Substation completion occurred in 2012 with the client taking occupancy before the punch list was even complete.

Bryce stayed with the project for the next two years as the Project Manager, handling design revisions to respond to changing needs and revising the site security design to comply with government grants for educational facilities.

Location:

4221 Pine Tree Dr, Miami Beach, FL 33140

Budget:

Private

Market Sector:

Civic

The post Miami Beach Jewish Community Center appeared first on Arch13 Studios.

]]>
207
Horry County Museum https://www.arch13.com/horry-county-museum/ Wed, 17 Jun 2015 17:40:48 +0000 http://www.arch13.com/?page_id=172 Horry County Museum is the local historical society museum in Conway, South Carolina. The museum was searching for a new home to house it’s expanding collections when the Burroughs School building was acquired from the local school board. The building has been on the National Register since 1984, having been built in 1905. The program […]

The post Horry County Museum appeared first on Arch13 Studios.

]]>
.easingslider-195 { max-width: 900px; }.easingslider-195 .easingslider-image { max-height: 600px; max-width: 900px; }.easingslider-195 .easingslider-fade-in, .easingslider-fade-out { -webkit-animation-duration: 400ms; -moz-animation-duration: 400ms; animation-duration: 400ms; }

Horry County Museum is the local historical society museum in Conway, South Carolina. The museum was searching for a new home to house it’s expanding collections when the Burroughs School building was acquired from the local school board. The building has been on the National Register since 1984, having been built in 1905.

The program called for a complete preservation of the historic shell, including contaminant remediation and reconstruction of damaged detailing. Inside, the program required a facility to American Alliance of Museum and Smithsonian standards to house traveling Smithsonian exhibits.

When Bryce joined a new firm in 2008, the firm had already been retained as the new designer and preservation team for the building. He joined the design team in 2010 as the new Project Manager and shepherded the project through two rounds of VE and revised permitting, as well as re-bidding and early CA. He was also given design freedom in the public and office areas, designing a vintage inspired ticket booth and modern office facilities in the back of house.

The project completed construction and opened to the public in 2014, being featured on a discovery channel show for it’s unique grand stair fish tank.Bryce and his office where notable for their successful preservation of the majority of the historic fabric, which included reclaiming the historic wood flooring, locating and installing replicas of the 1920’s lighting, and restoration of a majority of the horse-hair plaster original interior partitions.

Location:

805 Main St, Conway, SC 29526

Budget:

$2,500,000

Market Sector:

Civic

The post Horry County Museum appeared first on Arch13 Studios.

]]>
172
The Andrew Low House https://www.arch13.com/the-andrew-low-house/ https://www.arch13.com/the-andrew-low-house/#respond Tue, 26 May 2015 23:59:24 +0000 http://www.arch13.com/?page_id=102 The Andrew Low House was the location where the Girl Scouts of America was founded in 1912 in Savannah, GA. It was designated for preservation as a National Historic Treasure in the early 2000’s and funding was allocated via a grant in 2006 from the library of congress. the building is owned by the Daughters […]

The post The Andrew Low House appeared first on Arch13 Studios.

]]>

The Andrew Low House was the location where the Girl Scouts of America was founded in 1912 in Savannah, GA. It was designated for preservation as a National Historic Treasure in the early 2000’s and funding was allocated via a grant in 2006 from the library of congress. the building is owned by the Daughters of the American Revolution who appointed a board of members to oversee the the preservation and restoration. It’s directive was a complete preservation of exterior facades, the preservation of the interior living spaces, and the installation of modern ADA bathroom facilities in the lower quarters to assist the buildings mission as a museum.

When Bryce joined The Spriggs Group in 2008 he took over as the project manager for the project, started in earnest in 2007. Construction Drawings had already been completed and approved by the local municipality, local historic board, and national governing agencies. However the approved drawings where lite on specifications for replacement of historic fabric, as there was little available in the way of off the shelf products. As a result, Bryce was heavily involved in the vetting and selection of bespoke craftsmen to recreate historic details using authentic materials and methodologies to replace deteriorated areas.

This included;

  • The specification and selection of authentic solid wood double hung windows with period correct cloth chains. The historic windows where removed, a full spectral paint analysis was completed, remediation of lead pain was completed, and deteriorated areas where hand repaired.
  • The replacement of missing portions of the cast iron (Pig Iron) proper fence. this included materail testing to idetify time periods of fabrication and oversight of the fabrication of replacement of sections by master craftsmen with all peices being hand forged with reclaimed metal.
  • The replacement of wall sections of horse hair plaster. This included the careful removal of wallpaper with non-harmful techniques, plaster patching, and re-adhesion of the wallpaper with pH neutral adhesives.

Additionally, Bryce proposed the inclusion of several modern technologies including a completely hidden emergency light system with remote batteries powering historic fixtures and a new site lighting package that had not previously been part of the project scope.

The museum was reopened in 2009 and has been used in several movies since reopening.

The post The Andrew Low House appeared first on Arch13 Studios.

]]>
https://www.arch13.com/the-andrew-low-house/feed/ 0 102