Educational Archives - Arch13 Studios https://www.arch13.com/category/educational/ The personal website of Bryce W. Bounds Fri, 05 Jun 2020 03:22:39 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.5 https://www.arch13.com/wp-content/uploads/2020/04/cropped-A13favicon-1-32x32.png Educational Archives - Arch13 Studios https://www.arch13.com/category/educational/ 32 32 23344472 Stranahan High School https://www.arch13.com/stranahan-high-school/ Fri, 05 Jun 2020 03:18:08 +0000 http://www.arch13.com/?page_id=2165 Stranahan High School is a public school located in Ft. Lauderdale, Florida that was identified as in need of upgrades by the GOB Smart program of the Broward County Public School System. The school contains some of the oldest continuously operational buildings in the district, built immediately following WWII. Typical of ther period it’s concrete […]

The post Stranahan High School appeared first on Arch13 Studios.

]]>

Stranahan High School is a public school located in Ft. Lauderdale, Florida that was identified as in need of upgrades by the GOB Smart program of the Broward County Public School System.

The school contains some of the oldest continuously operational buildings in the district, built immediately following WWII. Typical of ther period it’s concrete was mixed using brackish ground water and it’s roofs are gypsum membrane systems not used in commercial constructions since the late 1960’s.

Wolfberg Alvarez & Partners was selected by the district to perform the fundamental building improvements and renovate spaces for new STEM Labs in 2016.

The scope included;

  • A new secure single point of entry for security and control
  • ADA upgrades to buildings
  • Campus wide re-roofing and substrate repair
  • Select new electrical, mechanical and life safety systems
  • Select public area improvements
  • Select classroom renovation for new STEM Labs identified by school staff. STEM labs include new Nursing and Material fabrication labs.
  • Media Center renovations

WA utilized the districts inventory of school deficiencies and extensive field verification to generate the contract document package for a CM at Risk project. Mr. Bounds served as the Project Architect, performing the field verification, meeting with key stakeholders to identify the improvements and attending bi-weekly OAC meetings with all parties to monitor construction and budget along with the districts project management company.

The project is ongoing with an expected completion date of late 2020 / early 2021

Location:

1800 SW 5th Pl, Fort Lauderdale, FL 33312

Budget:

$12 Million+

Market Sector:

Educational

The post Stranahan High School appeared first on Arch13 Studios.

]]>
2165
Blanche Ely High School https://www.arch13.com/blanche-ely-high-school/ Sat, 23 May 2020 17:25:23 +0000 http://www.arch13.com/?page_id=1947 Blanche Ely High School is a public school located in Pompano Beach. Florida that was identified as in need of upgrades by the GOB Smart program of the Broward County Public School System. It is one of three original high schools for colored children operated by Broward County and has undergone continuous expansion and improvement […]

The post Blanche Ely High School appeared first on Arch13 Studios.

]]>

Blanche Ely High School is a public school located in Pompano Beach. Florida that was identified as in need of upgrades by the GOB Smart program of the Broward County Public School System.

It is one of three original high schools for colored children operated by Broward County and has undergone continuous expansion and improvement since opening in 1951 as “Pompano Beach Negro High School”.  

Wolfberg Alvarez & Partners was selected by the district to perform the fundamental building improvements and renovate spaces for new STEM Labs in 2016.

The scope included;

  • Campus wide re-roofing and substrate repair
  • Select new electrical, mechanical and life safety systems
  • Construction of a new outdoor dining area for students
  • Select public area improvements
  • Select classroom renovation for new STEM Labs identified by school staff

WA utilized the districts inventory of school deficiencies and extensive field verification to generate the contract document package for a CM at Risk project. Mr. Bounds served as the Project Architect, performing the field verification, meeting with key stakeholders to identify the improvements and attending bi-weekly OAC meetings with all parties to monitor construction and budget along with the districts project management company.

The project is ongoing with an expected completion date of late 2020 / early 2021.

before image of a high school gym lobbyafter image of a high school gym lobby

Location:

1201 NW 6th Ave, Pompano Beach, FL 33060

Budget:

$ 12Million+

Market Sector:

Educational

The post Blanche Ely High School appeared first on Arch13 Studios.

]]>
1947