Preservation & Restoration Archives - Arch13 Studios https://www.arch13.com/category/preservation-restoration/ The personal website of Bryce W. Bounds Thu, 04 Jun 2020 03:51:39 +0000 en-US hourly 1 https://wordpress.org/?v=7.1.5 https://www.arch13.com/wp-content/uploads/2020/04/cropped-A13favicon-1-32x32.png Preservation & Restoration Archives - Arch13 Studios https://www.arch13.com/category/preservation-restoration/ 32 32 23344472 The Lynmar https://www.arch13.com/the-lynmar/ Tue, 23 Aug 2016 21:43:22 +0000 http://www.arch13.com/?page_id=297 The Lynmar is a contributing historic Deco building in the Miami Beach Historic District. Permitted months before the stock market crash of 1929, it was not constructed until the mid 1930’s when it was opened as a hotel. When opened it shared the block with only one other building and had a clear view of […]

The post The Lynmar appeared first on Arch13 Studios.

]]>
.easingslider-304 { max-width: 960px; }.easingslider-304 .easingslider-image { max-height: 600px; max-width: 960px; }.easingslider-304 .easingslider-fade-in, .easingslider-fade-out { -webkit-animation-duration: 400ms; -moz-animation-duration: 400ms; animation-duration: 400ms; }

The Lynmar is a contributing historic Deco building in the Miami Beach Historic District. Permitted months before the stock market crash of 1929, it was not constructed until the mid 1930’s when it was opened as a hotel. When opened it shared the block with only one other building and had a clear view of the ocean. The building fell into disrepair and had been converted to Section 8 housing by the mid 1990’s. It was purchased by a developer in 2013 and STA Architectural Group was retained to perform a complete renovation.

Given the building’s deffered maintenance, the core structure of wood members had rotted away, leaving a dangerous condition that needed to be addressed. The building had also been illegally modified and was over floor area ration in an ineffective way that produced little additional marketable square footage. The historic front and rear facades where braced, and the rest of the building rebuilt with a new footprint from the ground up. This allowed for a modern hydrostatic slab to be installed and a partial 3rd floor space with the potential for a green roof.

The completed building added white box commercial square footage to the up and coming Collins Ave shopping district on the beach, and the property was sold shortly after CO was achieved in 2016.

Bryce started out as the Project Manager overseeing staff producing the building, but as the historic conditions issues and costs increased, Bryce moved into the position of daily project management and production, handling permitting and CA to ensure the project was completed. He also handled several rounds of VE activities to control the budget, and interfaced with potential tenants on behalf of the client while representing STA Architectural Group.

Location:

735 Collins Ave, Miami Beach, FL 33139

Budget:

$2,500,000

Market Sector:

Commercial

The post The Lynmar appeared first on Arch13 Studios.

]]>
297
Horry County Museum https://www.arch13.com/horry-county-museum/ Wed, 17 Jun 2015 17:40:48 +0000 http://www.arch13.com/?page_id=172 Horry County Museum is the local historical society museum in Conway, South Carolina. The museum was searching for a new home to house it’s expanding collections when the Burroughs School building was acquired from the local school board. The building has been on the National Register since 1984, having been built in 1905. The program […]

The post Horry County Museum appeared first on Arch13 Studios.

]]>
.easingslider-195 { max-width: 900px; }.easingslider-195 .easingslider-image { max-height: 600px; max-width: 900px; }.easingslider-195 .easingslider-fade-in, .easingslider-fade-out { -webkit-animation-duration: 400ms; -moz-animation-duration: 400ms; animation-duration: 400ms; }

Horry County Museum is the local historical society museum in Conway, South Carolina. The museum was searching for a new home to house it’s expanding collections when the Burroughs School building was acquired from the local school board. The building has been on the National Register since 1984, having been built in 1905.

The program called for a complete preservation of the historic shell, including contaminant remediation and reconstruction of damaged detailing. Inside, the program required a facility to American Alliance of Museum and Smithsonian standards to house traveling Smithsonian exhibits.

When Bryce joined a new firm in 2008, the firm had already been retained as the new designer and preservation team for the building. He joined the design team in 2010 as the new Project Manager and shepherded the project through two rounds of VE and revised permitting, as well as re-bidding and early CA. He was also given design freedom in the public and office areas, designing a vintage inspired ticket booth and modern office facilities in the back of house.

The project completed construction and opened to the public in 2014, being featured on a discovery channel show for it’s unique grand stair fish tank.Bryce and his office where notable for their successful preservation of the majority of the historic fabric, which included reclaiming the historic wood flooring, locating and installing replicas of the 1920’s lighting, and restoration of a majority of the horse-hair plaster original interior partitions.

Location:

805 Main St, Conway, SC 29526

Budget:

$2,500,000

Market Sector:

Civic

The post Horry County Museum appeared first on Arch13 Studios.

]]>
172
Casa Marina Hotel https://www.arch13.com/casa-marina-hotel/ Fri, 05 Jun 2015 02:21:08 +0000 http://www.arch13.com/?page_id=157 Flagler’s original hotel at the end of his railroad in Key West, The Casa Marina Hotel was opened on new years eve 1920, shortly after Henry Flagler’s death. It cemented Key West’s designation as a vacation location for the United States free from the cold, and with the most modern amenities of the time including […]

The post Casa Marina Hotel appeared first on Arch13 Studios.

]]>
.easingslider-179 { max-width: 900px; }.easingslider-179 .easingslider-image { max-height: 600px; max-width: 900px; }.easingslider-179 .easingslider-fade-in, .easingslider-fade-out { -webkit-animation-duration: 400ms; -moz-animation-duration: 400ms; animation-duration: 400ms; }

Flagler’s original hotel at the end of his railroad in Key West, The Casa Marina Hotel was opened on new years eve 1920, shortly after Henry Flagler’s death. It cemented Key West’s designation as a vacation location for the United States free from the cold, and with the most modern amenities of the time including call buttons for room service and it’s own private rainwater cistern for fresh water for bathing.

Bryce’s firm was retained when the property, along with the neighboring Reach Resort, where acquired by a private equity firm for a complete upgrade while preserving the historic elements. As the team leader for the drafting team, Bryce was responsible for the field documentation and the complete DD drawing sets for bidding while overseen by the firm principals. To do this he lived in the hotel for extended periods, traveling from Savannah via private pane on Monday’s and returning Friday’s. While in Key West Bryce used his knowledge of the city as his family’s yearly travel vacation at their time share there to spend evenings at the historic society and library, researching historic images to find architectural details in old photos.

The property was branded as a Waldorf Astoria property when complete, and included a complete preservation and repair of this historic lobby and exterior decorative stucco detailing. All rooms where renovated to modern brand standards, which included extensive MEP rework and the installation of new pilings under existing structures added in the 1980’s that where experiencing settling issues.

As the onsite point person for the firm, Bryce was responsible for attending all consultant meetings, directing teams of employees and interns in field measurements, and organizing and drawing the Design Development set for pricing under the direction of a firm architect project manager.

Location:

1500 Reynolds St, Key West, FL 33040

Budget:

$ 10Million +

Market Sector:

Hospitality

The post Casa Marina Hotel appeared first on Arch13 Studios.

]]>
157
The Andrew Low House https://www.arch13.com/the-andrew-low-house/ https://www.arch13.com/the-andrew-low-house/#respond Tue, 26 May 2015 23:59:24 +0000 http://www.arch13.com/?page_id=102 The Andrew Low House was the location where the Girl Scouts of America was founded in 1912 in Savannah, GA. It was designated for preservation as a National Historic Treasure in the early 2000’s and funding was allocated via a grant in 2006 from the library of congress. the building is owned by the Daughters […]

The post The Andrew Low House appeared first on Arch13 Studios.

]]>

The Andrew Low House was the location where the Girl Scouts of America was founded in 1912 in Savannah, GA. It was designated for preservation as a National Historic Treasure in the early 2000’s and funding was allocated via a grant in 2006 from the library of congress. the building is owned by the Daughters of the American Revolution who appointed a board of members to oversee the the preservation and restoration. It’s directive was a complete preservation of exterior facades, the preservation of the interior living spaces, and the installation of modern ADA bathroom facilities in the lower quarters to assist the buildings mission as a museum.

When Bryce joined The Spriggs Group in 2008 he took over as the project manager for the project, started in earnest in 2007. Construction Drawings had already been completed and approved by the local municipality, local historic board, and national governing agencies. However the approved drawings where lite on specifications for replacement of historic fabric, as there was little available in the way of off the shelf products. As a result, Bryce was heavily involved in the vetting and selection of bespoke craftsmen to recreate historic details using authentic materials and methodologies to replace deteriorated areas.

This included;

  • The specification and selection of authentic solid wood double hung windows with period correct cloth chains. The historic windows where removed, a full spectral paint analysis was completed, remediation of lead pain was completed, and deteriorated areas where hand repaired.
  • The replacement of missing portions of the cast iron (Pig Iron) proper fence. this included materail testing to idetify time periods of fabrication and oversight of the fabrication of replacement of sections by master craftsmen with all peices being hand forged with reclaimed metal.
  • The replacement of wall sections of horse hair plaster. This included the careful removal of wallpaper with non-harmful techniques, plaster patching, and re-adhesion of the wallpaper with pH neutral adhesives.

Additionally, Bryce proposed the inclusion of several modern technologies including a completely hidden emergency light system with remote batteries powering historic fixtures and a new site lighting package that had not previously been part of the project scope.

The museum was reopened in 2009 and has been used in several movies since reopening.

The post The Andrew Low House appeared first on Arch13 Studios.

]]>
https://www.arch13.com/the-andrew-low-house/feed/ 0 102